Construction Progress

Talsinki Rising: February–August 2026

A chronological visual record of Talsinki's visible construction development, following the site from winter excavation through expanding slabs, columns and multi-level framing between February and August 2026.

Tallinn, Estonia

Tallinn, Estonia

February–August 2026

Architecture / Construction Progress

Architecture / Construction Progress

Nine documentation visits between February and August 2026 follow Talsinki from winter excavation to an expanding multi-level structure. Repeated viewpoints, site-wide aerials and closer observations make the changing footprint and construction stages legible over time. Photography and short film sequences are captured in parallel during the same visits, recording both the changing structure and the movement, activity and spatial relationships that still images cannot show alone.

Repeat elevated viewpoints make the changing footprint legible, while closer photographs of machinery, reinforcement, workers, columns and deck areas show how each stage altered the spatial character of the site. The sequence records only what the photographs visibly support.

FILM

Construction film documentation

Film coming soon

Commissioned by: Bildgren Ehitus OÜ

Development: USRE

Architecture: Arhitekt11 and HGA

Landscape architecture: TajuRuum