BUILT ENVIRONMENT · PÄRNU
Rääma sild
A photographic study of Rääma Bridge, following its steel structure from fabrication and assembly through completion, public opening and civic life.
Commissioned by INF Infra OÜ
Engineering and design by Stricto Project OÜ
Bridge concept by Andreas Papp and Dmitri Gorbatjuk
Built by INF Infra OÜ and AS EG Ehitus
Rääma Bridge links the Rääma district with central Pärnu across the Pärnu River. The 263-metre structure is defined by a 140-metre network arch, Estonia’s longest bridge span.
The photographic sequence begins with the fabrication of its steel elements and their journey to the site, then moves through assembly, construction and the completed crossing. Workers, machinery and repeated geometry reveal the human and material scale behind the finished structure.
The final chapter moves from quiet architectural views into the public opening on 21 June 2025. Crowds, ceremony and evening light mark the moment when the construction site became part of the city.























